Skip to main content

Kerang Solar & Battery Hybrid

Kerang Hybrid is a proposed 161 MWDC Solar Farm with a 55 MW 2-hour battery (AC coupled) located on private land adjacent to the Kerang Terminal Station, south of Kerang in regional Victoria. The Project received Development Approval from Gannawarra Shire Council in 2012, and grid connection approval (5.3.4A) from AEMO in July 2025. Construction is expected to commence late…
Read More

Burdekin Battery & Solar Farm

Burdekin Battery Energy Storage System (Battery) & Solar Farm is a proposed 140 MWDC solar farm and 500 MW Battery with up to 4 hours of storage located on private land approximately 12km south-west of Clare in regional Queensland. The project will connect to a nearby 275 kV high voltage transmission line to enable power to be exported into the…
Read More

Forbes Solar Farm & Battery Hybrid

Forbes Solar & Battery Energy Storage System (Battery) Hybrid is proposed as a 141 MWDC Solar Farm and 100 MW Battery with up to 4 hours of storage located on private land approximately 10 km north of Forbes in regional New South Wales. The project will connect directly to the existing 132 kV high voltage transmission line that traverses the project…
Read More

Narrabri Solar & Battery Hybrid

Narrabri Solar & Battery Energy Storage System (Battery) Hybrid is proposed as a 140 MWDC Solar Farm and 100 MW Battery with up to 4 hours of storage located on of private land approximately 11km north-east of Narrabri in regional New South Wales. The project will connect directly to the existing 132 kV high voltage transmission line that traverses the…
Read More

Narrogin Solar Farm & Battery

Narrogin Solar Farm & Battery Energy Storage System (Battery) is proposed as a 200 MWDC solar farm and 4-hour 200 MW battery located on private land south of the township of Narrogin in regional Western Australia. The project will connect to the grid at the Narrogin South Substation to enable power to be exported into Western Australia’s electricity market. If…
Read More